New Line Construction
If you require a new electric service built or modified, contact Continental Divide Electric's Engineering Department when you are drawing up your construction or remodeling plans.
CDEC will meet with you and review your needs to determine the kind of power line construction needed. The process usually takes at least one (1) month.
Call us at (505) 285-6656.
200 E. High St., P.O. Box 1087, Grants, NM 87020 • (505) 285-6656
